A Portion of Hwy 6 is currently under construction and detours are set up.
15.08 km north of Leroy Access to Vicinity of Watson
- Under Construction
- Use alternate route
- Local detour
- Road closed
Please be advised that CN is fixing the rail in the vicinity of the Town of Watson. The road is closed and a detour is set up. Watch for signs. Road closure should be from 8 to 12 hours long starting at 8:30 a.m on March 6th.